Ship supply in Egypt ports means delivering provisions, stores and spare parts to a vessel while it calls at a port, an anchorage or the Suez Canal. Therefore, good planning of the order, the documents and the delivery time decides whether the ship sails on schedule. In addition, the exact rules differ by port, so always confirm them first.
First, this guide explains the usual ship supply procedure at Egyptian ports. Then it lists the documents to prepare and the common mistakes to avoid.
What Is Ship Supply at Egyptian Ports?

Ship supply covers the items a vessel needs during a port call. For example, these include deck and engine stores, spare parts, provisions, safety equipment and technical items. The supplier delivers them alongside, at the anchorage or to the Suez Canal transit area, depending on the call.
Because Egypt lies on the route between Europe and Asia, many ships take supplies here. Meanwhile, a short port stay leaves little room for delay. For the technical side of vessel upkeep, see our guide on vessel annual survey certificates.
Ship Supply Procedure at Egypt Ports, Step by Step
- Send the request. First, the master, the superintendent or the ship’s agent sends the requisition with item descriptions, quantities and the vessel’s ETA.
- Receive the quotation. Next, the supplier confirms prices, availability, lead time and delivery place.
- Confirm the order. Then the buyer approves the quotation and the delivery details in writing.
- Prepare the documents. After that, the supplier and the agent prepare the paperwork needed for clearance.
- Arrange clearance and access. In addition, the local agent coordinates port and customs permission for the goods and the delivery crew.
- Deliver to the vessel. Then the goods go alongside by truck, launch or lighter, depending on the berth or anchorage.
- Check and sign. Finally, the ship checks the items against the delivery note and signs the receipt.

Documents for Ship Supply in Egypt Ports
Paperwork varies by item and by authority. However, the following documents are common. Therefore, ask your agent which ones apply to your call.
| Document | Purpose |
|---|---|
| Requisition or purchase order | Lists items, quantities and the vessel’s details |
| Quotation and order confirmation | Fixes price, delivery place and time |
| Commercial invoice and packing list | Describe the goods for clearance and for the ship |
| Delivery note | Signed by the ship to confirm what was received |
| Agent’s clearance paperwork | Allows the goods and the delivery crew to reach the vessel |
Common Problems and How to Avoid Them

- Late requests. Send the requisition as early as possible, because spare parts may need extra lead time.
- Unclear item descriptions. Give part numbers, makers and drawings, so that the right item is supplied the first time.
- Wrong delivery place. Confirm the berth or anchorage and update the ETA, since ships often change schedule.
- Missing paperwork. Ask the agent early which documents the port needs.
- No inspection on delivery. Check quantities and condition before signing, because later claims are harder to prove.
For official information on the canal and its services, you can visit the Suez Canal Authority.
Pre-Berthing and Berthing Surveys: Avoid Port Damage Claims
Ship supply often takes place while the vessel is alongside. However, when a ship berths, any damage found on the fenders, the quay wall or the bollards can be blamed on her, even if it was already there. Therefore, an independent survey before and during berthing protects the owner, the charterer and the P&I club from port claims for old damage.
Before berthing
- First, the surveyor inspects the assigned berth: fenders, quay edge, bollards and mooring fittings.
- Next, every existing defect is recorded with time-stamped photos and its exact position on the berth.
- Then the findings are shared with the master and the agent before the ship comes alongside.
During berthing and while alongside
- The surveyor attends the approach and the mooring and notes any contact with the fenders or the quay.
- In addition, if the port reports damage, the surveyor compares it with the pre-berthing record, so pre-existing damage is not charged to the ship.
- Finally, a short report with photos is issued, ready for the owner, the agent or the P&I club.
AGI carries out pre-berth, fender and quay condition surveys at all Egyptian ports, 24/7. Contact us to book a surveyor before your next call.
Frequently Asked Questions
What is included in ship supply?
It usually includes provisions, deck and engine stores, spare parts and safety or technical items needed during the port call.
How early should I send the order?
As early as possible. Moreover, send it before arrival, since lead times for parts and clearance can be longer than the port stay.
Who handles clearance for the goods?
Usually the ship’s agent works with the supplier and the port to arrange clearance. Therefore, confirm the roles in writing before the call.
Can items be delivered to a ship at anchor?
Often yes, by launch or lighter, subject to local permission and weather. However, always check with your agent first.
Can a ship be charged for old damage to the quay or fenders?
It can happen if nobody recorded the berth’s condition before arrival. Therefore, a pre-berthing survey with dated photos is the best evidence that the damage was already there.